Pages

Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Wednesday, January 11

30 Storey Building Constructed In 15 Days!

Friday, January 28

10 killed in fall from 28th floor

DEATH PLUNGE. A service platform at the 28th floor of the
Eton Residences on Paseo de Roxas corner Gallardo Street in
Makati City collapsed on Thursday, plunging 10 construction
workers to their deaths. (Inset) Rescuers retrieve the bodies of
the workers. RODEL ROTONI
By Jaymee T. Gamil
Philippine Daily Inquirer
First Posted 02:44:00 01/28/2011



MANILA, Philippines—An urban nightmare played out to a horrified lunchtime crowd at the Makati central business district Thursday as cables of an overloaded gondola at a construction site snapped, plunging 10 workers aboard to their deaths, authorities said.

The gondola, a motorized steel basket-like platform, plummeted as it was coming down from the 28th floor at the Eton Residences Greenbelt, crashing to a halt at the seventh floor and throwing out its 11 passengers.

Only one worker survived the accident at the 39-story premium residential condominium undergoing construction on Gallardo Street in Legaspi Village. He identified himself to responding firemen as Rowel Perez, 23, before he was rushed to Ospital ng Makati, where the other victims were taken.

Guillermo Torres, project manager, said it was actually difficult to determine from which floor the gondola originated. “Only the survivor could give an accurate account on where they actually came from.”

Dead on the spot were Joel Abesilla, Celso Mabuting, Michael Tatlonghari, Kevin Mabunga, Borz Cristobal, Rommel Perez, Vicente Piñon, William Bañez, Jaykie Legada and Jeffrey Diocado, according to Senior Fire Officer 2 Gerson Moncada of the Makati Bureau of Fire Protection (BFP).

Moncada said the gondola was carrying more than its capacity of two persons at the time of the accident at lunch break.

Overloaded


“According to an eyewitness account, the workers rode the gondola instead of taking the stairs during their break time. However, since the platform can only carry a few workers, the cable snapped,” Eton said in a statement.

Denny Villanueva, a driver at a neighboring building, said he saw the gondola as it was hurtling down.

“It dropped so fast. They were all crammed inside. They were probably hitching a ride down for lunch,” Villanueva said.
Another witness, food stall attendant Mary Ann Centro, 34, said the gondola hit the seventh floor with a terrible sound—“so loud I thought the building had collapsed.”

“I started to scream, too, as passersby pointed and shrieked, ‘Tulungan niyo mga tao!’ (‘Help those people!’),” Centro said.

When she stepped out from her stall, she saw two bodies hanging from the debris catcher wire mesh.

Centro said work on the construction site had been going on for a year and there was only one major accident. “Last year, a steel bar fell on a car, but no one was hurt,” she said.

Broken limbs


FO1 Jomar Jumawan, one of the BFP rescuers, said the victims—all glass installers of Arlo Aluminum under contract with Eton—had broken limbs and bloodied heads.

“Six victims were piled up on the debris catcher. Two were sprawled on the floor below it. Three victims were found on the edge of the eighth floor,” Jumawan said in Filipino.

SFO1 Frankie Romaraog of the BFP-Emergency Medical Services said Perez, the lone survivor, had a dislocated shoulder. “There was blood on his head, and oozing out of his nose,” said Romaraog, who still had blood on his gloves.
It took rescuers at least two hours to retrieve all the bodies. Three hours after the accident, the red gondola, splayed out and broken, could still be seen suspended on the seventh floor.

Eton spokesperson Erwin de Pedro later arrived at the construction site and read the company’s statement.

“Our hearts go out to the victims’ families. Eton Properties would like to assure the public that the company is doing all it can to ensure that Eton and its contractor extend all necessary assistance to the victims,” De Pedro said.

Safety investigation


When informed by the media that the city engineer’s office had ordered the stoppage of the construction, De Pedro said: “We have yet to talk to our contractor about that, but we will cooperate with any investigation by the government.”

Moncada identified the contractor as CE Construction. The project was under manager Guillier Torres, he said.
De Pedro entered the building with the Department of Labor and Employment occupational safety engineer, who had come to inspect the site for safety regulation violations.

The spokesperson stressed that Eton placed a premium on safety and enforced strict safety regulations in all its construction projects.

But due to the accident, Eton is reviewing the compliance of its contractors and construction management consultant to these safety regulations, De Pedro said.

“Eton, its contractors and construction management consultant are cooperating with police authorities and the city engineer’s office as they investigate the cause of this accident. In the meantime, the company’s priority is to ensure that the victims’ families are informed and extended needed assistance by the contractor,” De Pedro said.

Palace sympathies


Makati Mayor Jejomar Erwin Binay ordered work at the site suspended “until we are sure that the workers there are safe.”

“We extend our sympathies to the families of those who were tragically killed in the accident. Nobody would like an accident like this to happen, even the owners of the building,” said presidential spokesperson Edwin Lacierda.

The labor department said it had sent inspectors to the Eton site to investigate compliance with safety standards.

“We’ll see if the accident that happened was related to the conduct of their work and if the construction firm is liable,” said Labor Secretary Rosalinda Baldoz.

Lucio Tan Group


The company’s website describes Eton as the global real estate arm of the Lucio Tan Group and a sister company of Philippine National Bank and Philippine Airlines. It says the company also has operations in Beijing, Hong Kong and Shanghai.

The Philippines, particularly Metro Manila, has been experiencing a construction boom since last year, boosted by low interest rates, the large amount of foreign remittances from 9 million Filipinos working abroad and the need for more office space to accommodate the country’s growing outsourcing industry. With reports from Christine O. Avendaño, Jerome Aning, Doris C. Dumlao, Miko Morelos and Associated Press








Article taken here.

Saturday, October 16

World's longest tunnel breaks down Swiss Alpine barrier


Photo by Agence France Presse
SEDRUN, Switzerland (AFP) - – A giant drilling machine punched its way through a final section of Alpine rock on Friday to complete the world's longest tunnel, after 15 years of sometimes lethal construction work.
In a stage-managed breakthrough, attended by some 200 dignitaries, 30 kilometres (20 miles) inside the tunnel and broadcast live on Swiss television, engineers from both sides shook hands after the bore had pummeled through the final 1.5 metres (five feet) of rock.
"Here, in the heart of the Swiss Alps, one of the biggest environmental projects on the continent has become reality," said Swiss Transport Minister Moritz Leuenberger.
Tunnel workers paid tribute to their colleagues who had died on the construction site with a minute's silence as the names of the eight victims were read out during an emotional ceremony for the breakthrough.
"Workers, thank you, thank you, thank you. We have not only built a tunnel, we have written history," said Luzi Gruber of the construction company Implenia.
The 57-kilometre (35.4-mile) high-speed rail link, which will open in 2017, will form the lynchpin of a new rail network between northern and southeastern Europe and help ease congestion and pollution in the Swiss Alps.
It is the third tunnel to be built through the snowbound St. Gotthard area but it is much the longest and three kilometres longer than a rail link between two Japanese islands, the current record holder at 53.8 kilometres.
"The myth of the Gotthard has been broken for a third time. Our forefathers struggled from the Middle Ages onwards to make this mountain passable," Peter Fueglistaler, director of the Federal Transport office, told journalists gathered for the final breakthrough.
Passengers will ultimately be able to speed from the Italian city of Milan to Zurich in less than three hours and further north into Germany, cutting the journey time by an hour.
Once completed, around 300 trains should be able to speed through the Gotthard's twin tubes every day, at up to 250 kilometres per hour (155 mph) for passenger trains.
The 9.8-billion Swiss franc (7.0-billion euro, 9.8-billion dollar) tunnel, which is 9.5 metres in diameter, is also the fruit of strong popular environmental concern about pollution in the Swiss Alps.
Switzerland nonetheless struggled to convince sceptical European neighbours to support the ambitious and costly transalpine rail plans. But Swiss voters helped force the issue in 1994 by supporting a ban on heavy trucks driving across the Alps -- including the expanding flow of transiting EU goods traffic.
A nationwide poll published on Wednesday suggested that sentiment is undimmed, with two thirds supporting a ban on truck traffic through the Gotthard road tunnel and moving it on to rail.
But a senior Swiss official warned the full benefit of the rail tunnel can only be realised if Germany and Italy complete complementary infrastructure.
"For a noticeable amount of freight to be shifted from road to rail, our neighbouring countries Germany and Italy will have to fulfill their contractual obligation to extend access routes," said Peter Fueglistaler, director of the government's Federal Transport Office.
In recent years, Austria, France and Italy have set in motion two similar rail tunnel projects through the eastern and western Alps, which are both planned to exceed 50 kilometres in length in the 2020s.
Apart from the economic and environmental implications, the spotlight was on more than 2,000 tunnel workers, especially following the rescue of Chile's trapped miners.
The builders, who have blasted and bored through 13 million cubic metres (460 million cubic feet) of rock, were feted at a celebration just above the breakthrough point in the mist-bound village of Sedrun.
As the two tunnels became one, tunnelers unfurled a Swiss flag to a thunder of applause.
One of the first to make it through, Hubert Baer, told the crowd: "It's a wonderful feeling, it's an honour to have participated in the construction of the longest rail tunnel in the world."
Scene: Santa Barbara stands watch over world's longest tunnel


============================================================
Source: http://ph.news.yahoo.com/afp/20101016/tts-switzerland-transport-tunnel-rail-en-c1b2fc3.html

Monday, October 11

3 RP firms stay on World Bank blacklist

3 RP firms stay on World Bank blacklist
ABS-CBN - Sunday, October 10



MANILA, Philippines - Three Philippine construction companies and the owner of one firm have remained on the World Bank's blacklist for alleged fraud and corruption.
The international lender updated on Friday its list of debarred companies and individuals worldwide, with 45 more blacklisted after year-long anti-corruption investigations. 
C.M. Pancho Construction Inc., Cavite Ideal International Construction and Development Corp., and E.C. De Luna Construction Corp. were accused by the institution's anti-fraud watchdog in January last year of forming a cartel to secure a major WB-financed roads project in the Philippines.
The trio, including E.C. De Luna owner Eduardo de Luna, were found to have violated the WB's Procurement Guidelines 1.15(a)(ii) pertaining to fraud in connection with the bank-funded National  Roads Improvement and Management Program 1.
"'Fraudulent practice' means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment of the Borrower, and includes collusive practices among bidders... designed to establish bid prices at artificial, non-competitive levels and to deprive the Borrower of the benefits of free and open competition," according to the WB.
The bank indefinitely blacklisted E.C. de Luna and its owner, the first permanent debarments since 2004.
C.M. Pancho and Cavite Ideal, meanwhile, were debarred for 4 years each. They are banned from taking part in WB-funded projects until January 12, 2013.
"The debarment can be reduced or terminated after two years if that firm puts in place a compliance program satisfactory to the World Bank," the international lender said in a press statement.
“Misuse of public money is a problem for everyone. It deprives the poorest people of the development funds that are so vitally needed and it undermines public confidence in public and private institutions," said James Adams, World Bank vice-president for East Asia.
"This case shows our processes working as they should:  we detected the possibility of collusion early, we took action to investigate, we worked with the Government of the Philippines to strengthen anti-corruption controls in the next phase of the project and after an extensive and fair process, we have sanctioned the parties involved."
The debarment, however, has not prevented C.M. Pancho and Cavite Ideal from joining the bidding for other infrastructure projects.
The two companies have tendered bids for a P706-million Plaridel Bypass Road project in Bulacan that is being co-financed by the Japanese government, according to the Manila Standard.
Bank cleans house
The WB has debarred 406 firms, individuals, and non-governmental organizations since since 1999.
"The firms and individuals... are ineligible to be awarded a World Bank-financed contract for the periods indicated because they were found to have violated the fraud and corruption provisions of the Procurement Guidelines or the Consultants Guidelines. These findings were made through an administrative process that permitted the accused firms and individuals to respond to the allegations," the international lender states in its website.
Aside from placing 45 more erring companies and individuals on its blacklist this year, the bank referred 32 cases to governments and anticorruption agencies for follow-up action.
It also signed a cross-debarment agreement with other similar instutitions such as the Asian Development Bank, the African Development Bank, the European Bank for Reconstruction and Development, and the Inter-American Development Bank.
“The results of the last two years speak volumes about the World Bank Group’s commitment to ensuring that project funds reach their intended beneficiaries.  I anticipate that the next two years will even be more challenging and rewarding,” said Leonard McCarthy, the bank's Integrity vice-president.
The bank anti-corruption watchdog's Preventive Services Unit (PSU) had been focusing on finding ways to foresee problems involving high-risk projects worldwide.
The PSU reviewed risks in two particularly vulnerable sectors: the road sector and community-development projects.
It also trained 1,200 people within and outside the financial institution on prevention and integrity risk mitigation measures.
The PSU and the WB's other units have developed new advisory tools to safeguard funds intended for development programs. The tools include a handbook on fraud and corruption risks and a red-flags manual.
“As we further ramp up our operations, we must continue to assure donors and client governments that we are responsible stewards of scarce development funds,” said World Bank Group President Robert Zoellick. “Working with governments, the private sector, and other international institutions, our governance and anti-corruption efforts can also help restore the public’s trust in financial institutions and markets.”  

Monday, April 26

Cebu City engineer to closely monitor construction following accidents - INQUIRER.net, Philippine News for Filipinos

By Jhunnex Napallacan
Inquirer Visayas
First Posted 20:14:00 04/26/2010

Filed Under: Accidents (general), Construction & Property,Safety of Citizens



CEBU CITY, Philippines – Following the occurrence of another accident at a construction site, the Office of the Building Official (OBO) here has decided to closely monitor all ongoing construction activities in the city.

Engr. Josefa Ylanan, the OBO chief, said the OBO would conduct random checks on the different construction sites in Cebu City to determine if safety measures were in place.

Ylanan issued the statement after an accident occurred at the Aegis People Support expansion building in Asiatown IT Park in Barangay (village) Lahug, Cebu City Saturday evening, injuring one construction worker working for the DCD Construction Inc.

It was the second accident for the month. The first was last April 7, at the Gaisano Capital Building in Barangay Tisa, also in Cebu City, killing five construction workers.

Ylanan said they have set a meeting with contractors to discuss their compliance with the safety measures.
“I will call the attention of all the contractors. I will call the Cebu Contractors Association to remind them of their responsibilities. They should not be careless,” she said.

Ylanan also said that Section 308 of the National Building Code requires a project engineer should be present to oversee construction works.

Ylanan said she would visit the Aegis People Support construction site to talk with representatives of the DCD Construction Inc.

The OBO would check if a project engineer was present when the accident occurred and if the construction firm undertook measures to ensure their workers’ safety, she added.

The OBO had suspended the construction activities at the expansion building of Aegis People Support, a call center company, pending the result of the administrative investigation.

Monday, November 9

The 19th PHILCONSTRUCT



Date

November 12-15, 2009 (Thursday to Sunday)

Venue

SMX Convention Center, Seashell Drive, Mall of Asia Complex, Pasay City

Who Should Exhibit

The PHILCONSTRUCT/Modern Home Expo attendees will be eager to see your company's products in the following areas:

Why Should You Exhibit?

PHILCONSTRUCT and Modern Home Expo attract thousands of genuine buyers and specifiers on the look – out for the latest developments and future industry trends. As an exhibitor, this is your company's chance to:

==========================
Source:  http://www.globallinkph.com/event_2009_philconstruct.htm

Monday, March 16

Critics target reuse of building site soil

Critics target reuse of building site soil
Chicago environmental activists urge delay of proposed law change

Chicago environmental activists urged the city Sunday to delay approval of a proposal that would allow crews to reuse soil from construction sites even if the dirt contains lead, arsenic, benzene and other chemicals.

Activists from the Pilsen neighborhood said their community has too often been a dumping ground for toxic materials and that the ordinance, which will come before the City Council's Environment Committee on Monday, raises too many questions to merit speedy approval.

"For many, many years the city has not taken soil contamination seriously, and it's our responsibility as communities of color that are severely impacted to call upon them and say it's too quick to make a decision," said Kim Wasserman of the Little Village Environmental Justice Organization.

The city's soil contains plenty of contaminants after decades of heavy traffic and industrial activity. Dirt removed from construction projects must be transported to landfills and replaced with earth that typically is taken from Downstate farmland.

The ordinance would allow Chicago's dirt to be reused at other construction sites as long as tests showed that its level of contaminants was beneath thresholds established by the city and state. Soil deemed unsafe would continue to be taken to landfills.

Suzanne Malec-McKenna, the city's environment commissioner, said trucking away construction soil and importing new dirt add needless expense to public works projects.

"You're going to have certain levels of chemicals in the soil, but not levels that are unsafe for human health and the environment. ... It's the reality of living in a community that has cars and trucks and the history of a city," she said.

Malec-McKenna said the city and state have been working on the plan for two years, and that the Environment Committee held a hearing last month on the proposal.

The Pilsen activists said they wanted more time to study the proposal's impact. If the ordinance clears the committee, the City Council could vote on it Wednesday.


jkeilman@tribune.com

Source: http://www.chicagotribune.com/news/local/chi-soil-ordinance-16mar16,0,1043028.story?track=rss

Related Posts Plugin for WordPress, Blogger...